Headpond PLTM Pusaka 1 (2x4.4MW) is located in Kec. Pasirkuda, Indonesia on Q6M674R, Unnamed Road, Pusakajaya. Headpond PLTM Pusaka 1 (2x4.4MW) is rated 5 out of 5 in the category hydroelectric power plant in Indonesia.
Address
Q6M674R, Unnamed Road, Pusakajaya